This animation shows one way that the proposed bermed tunnel between Cleary Station and Skead Street could be naturally ventilated while incorporating a continuous recreation path on the south side of the Sir John A. Macdonald Parkway.
This animation shows one way that the proposed bermed tunnel between Cleary Station and Skead Street could be naturally ventilated while incorporating a continuous recreation path on the south side of the Sir John A. Macdonald Parkway.